HEB ISD - HARWOOD AND BEDFORD JUNIOR HIGH DOOR RENOVATION.

The "Project" of which the "Work" of this Contract is a part, is titled ​Harwood and Bedford Junior High Door Renovation​ for ​Hurst-Euless-Bedford ISD​ and is composed of ​door hardware replacement, door repair​ and related ​​ work located in ​Bedford, Texas​.
  PLANS (click to expand/collapse)
Order files below, price will be calculated by SQFT
Name Size
01 G1.1 - COVER SHEET 162.2 KB
02 G1.2 - GENERAL DATA 3.6 MB
03 AD1.1 - DEMOLITION FLOOR PLAN -SECTION A 577.8 KB
04 AD1.2 - DEMOLITION FLOOR PLAN -SECTION B 623.2 KB
05 AD1.3 - DEMOLITION FLOOR PLAN -SECTION C 376.6 KB
06 AD1.4 - DEMOLITION FLOOR PLAN -SECTION D & E 435.8 KB
07 AD1.5 - DEMOLITION FLOOR PLAN -SECTION F 382.9 KB
08 AD1.6 - DEMOLITION FLOOR PLAN -SECTION G 219.6 KB
09 AD1.7 - DEMOLITION FLOOR PLAN -SECTION H 374.5 KB
10 A1.1 - MASTER PLAN 1.9 MB
11 A1.2 - FLOOR PLAN -SECTION A 661.6 KB
12 A1.3 - FLOOR PLAN -SECTION B 730.5 KB
13 A1.4 - FLOOR PLAN -SECTION C 449.7 KB
14 A1.5 - FLOOR PLAN -SECTION D & E 509.3 KB
15 A1.6 - FLOOR PLAN -SECTION F 431.2 KB
16 A1.7 - FLOOR PLAN -SECTION G 544.8 KB
17 A1.8 - FLOOR PLAN -SECTION H1 617.2 KB
18 A1.9 - FLOOR PLAN -SECTION H2 328.2 KB
19 A3.1 - HOLLOW METAL DOOR SCHEDULE & CONFIGURATIONS 299.6 KB
19 A3.1 - HOLLOW METAL DOOR SCHEDULE AND CONFIGURATIONS 320.3 KB