Public Jobs

Bids due in 24 days
5/17/21 12:00 pm
UTSW - UPD BE (FRESENIUS) BUILDING RENOVATIONS.
DFW Planroom
Dallas, Texas
Full interior renovation of the existing Fresenius to accommodate the university police department.
Bids due in 25 days
5/18/21 2:00 pm
HARRIS COUNTY DEPT. OF EDUCATION - NEW ACADEMIC & BEHAVIOR SCHOOL EAST
TEXAS PLANROOM
Houston, TX 77012
The Harris County Department of Education is seeking Competitive Sealed Proposals from qualified proposers to provide construction services for the new HCDE's Academic and Behavior School East.
Bids due in 11 days
5/4/21 1:00 pm
CLEVELAND ISD - CLEVELAND HS AND MS BAND HALL RENOVATION
TEXAS PLANROOM
Cleveland, TX 77327
The Owner plans to paint the existing high school that was not included in the previous expansion, and to renovate the existing band halls at the existing high school and middle school. The Project may include the following general scope items: 1. Aluminum, glass and window wall 2. Interior walls 3. Tile, resilient flooring, sheet carpeting, resinous athletic flooring 4. Suspended plaster, suspended drywall, lay-in panels, sound absorbing units 5. Steel doors and frames, wood doors, Kynar coated storefront, overhead coiling doors 6. Casework 7. Specialties 8. Plumbing systems 9. HVAC Systems and building automation 10. Electrical and telecommunications systems 11. Fire detection, alarm and emergency call systems.
Bids due in 18 days
5/11/21 2:00 pm
HEB ISD - HARWOOD AND BEDFORD JUNIOR HIGH DOOR RENOVATION.
DFW Planroom
Bedford, Texas
The "Project" of which the "Work" of this Contract is a part, is titled ​Harwood and Bedford Junior High Door Renovation​ for ​Hurst-Euless-Bedford ISD​ and is composed of ​door hardware replacement, door repair​ and related ​​ work located in ​Bedford, Texas​.
Bids due in 13 days
5/6/21 4:00 pm
REES ASSOCIATES, INC.- HEREFORD REGIONAL MEDIACAL CENTER CONNECTING CORRIDOR
TEXAS PLANROOM
Hereford, TX, 79045
Enclosed Connecting corridor from Medical Office Building to Hospital front entry. Approximatly 3,915 gross sq feet. Brick veneer on metal stud construction. Storefront windows and doors.
Bids due in 13 days
5/6/21 2:00 pm
BARTLETT COCKE GENERAL CONTRACTORS - LIBERTY ISD MULTY-CAMPUS RENOVATIONS PACKAGE A.
TEXAS PLANROOM
Liberty Hill, TX
This project will consist of work at 4 different Liberty Hill ISD school locations: Liberty Hill Elementary, Rancho Sienna Elementary, Liberty Hill Intermediate, and Liberty Hill Junior High.
Bids due in 11 days
5/4/21 2:00 pm
HEB ISD - WEST HURST CONVERSION
DFW Planroom
Hurst, Texas
The "Project" of which the "Work" of this Contract is a part, is titled ​West Hurst Conversion​ for ​Hurst-Euless-Bedford ISD​ and is composed of ​campus additions, renovations​ and related ​site​ work located in ​Hurst, Texas​.
Bids due in 6 days
4/29/21 1:30 pm
CITY OF FORT WORTH - BOB BOLEN POLICE EVIDENCE AND FIRE ARSON RENOVATIONS
DFW Planroom
Fort Worth, Texas
Work of this Project is described as renovations to an existing one-story facility entitled Bob Bolen Public Safety Complex, located at 505 Felix St., Fort Worth, TX.
Bids due in 4 days
4/27/21 2:00 pm
ALEDO ISD - MCANALLY INTERMEDIATE SCHOOL CONVERSION TO ELEMENTARY SCHOOL CSP 21-040221
DFW Planroom
Aledo, Texas
New classroom addition (Tornado Shelter) 9,483 sq. ft., one-story, and renovations of the existing building K-5, 800-Student Elementary School, Steel Framed, with ICF Framed ICC 500 Storm Shelter fourth grade classroom addition.
Bids due in 20 days
5/13/21 2:00 pm
RENOVATION FOR ESC REGION 11
DFW Planroom
White Settlement, Texas
The "Project" of which the "Work" of this Contract is a part, is titled ​Renovation for ESC Region 11​ and is composed of ​interior renovations​ and related ​​ worK located in ​White Settlement, Texas​.