CLEVELAND ISD - CLEVELAND HS AND MS BAND HALL RENOVATION

The Owner plans to paint the existing high school that was not included in the previous expansion, and to renovate the existing band halls at the existing high school and middle school. The Project may include the following general scope items: 1. Aluminum, glass and window wall 2. Interior walls 3. Tile, resilient flooring, sheet carpeting, resinous athletic flooring 4. Suspended plaster, suspended drywall, lay-in panels, sound absorbing units 5. Steel doors and frames, wood doors, Kynar coated storefront, overhead coiling doors 6. Casework 7. Specialties 8. Plumbing systems 9. HVAC Systems and building automation 10. Electrical and telecommunications systems 11. Fire detection, alarm and emergency call systems.
  Addenda 1 (click to expand/collapse)
  Addenda 2 (click to expand/collapse)
  Addenda 3 (click to expand/collapse)